Construction Services Project Gallery
![]()
![]()
Machala, Ecuador
![]()
![]()
GE ENERGY selects GENESYS COLOMBIA SAS to provide technical assistance during the conversion of an existent GE LM 5000 Gas Turbine to the GE LM 6000 – Sprint model at the Termocoa Power Plant, property od ECOPETROL S.A. at Villavicencio Colombia. Our objectives: to provide detail engineering, execute electromechanical and civil construction works of the required modifications required in the turbo group package: GE LM6000 Gas Turbine and Brush 60MVA. Additionally, GENESYS will install auxiliary equipment and control systems required in the new facility.
6 x GE TM 2500 Pascuales, Ecuador. First fire turbine No. 6
December 20, 2009
At the beginning of the month of December 2009, we accepted the challenge of developing and executing the EPC (in conjunction with GE and SANTOS CMI) of 6 X GE TM2500 that would support the National Interconnected Electric System (SIN) for a total of 120MW helping solve the Ecuadorian electric crisis.
![]()
![]()
6 x GE TM 2500 Pascuales, Ecuador. First fire turbina No. 6
December 20, 2009
The Electrical engineering, concept and detail, Procurement, Construction and Assembly, Commissioning and Start-up of the first three TM2500 turbines located close to the Enrique García Plant in Pascuales, Guayaquil was developed in a record time of four weeks thanks to our experience and teamwork on electric generation Fast Track projects developed in a variety of Latin-American countries.
![]()
![]()
6 x GE TM 2500 Pascuales, Ecuador. 69KV Bay and SNI Tower.
December 30, 2009
The Engineering, supply, assembly and construction of the 69KV portal was carried out with the respective outfits of Bahia Teams. Assembly of the equipment for the patio included the Commissioning and Start-up crews.
![]()
![]()
6 x GE TM 2500 Pascuales, Ecuador. XFMR 13.8/69KV 100MVA
December 30, 2009
Genesys contributes to the solution of the energy crisis of Ecuador. Mounting, filter press, assembly, tests and principal transformer start-up. Assembly of the equipment for the patio included the Commissioning and Start-up crews.
![]()
![]()
6 x GE TM 2500 Pascuales, Ecuador.
January, 2008
Engineering (civil, electromechanical), manufacture of lattices, mounting and construction of 2 transmission towers for interconnecting to the SNI.
![]()
![]()
1 x GE TM 2500 Manta, Ecuador.
December 30, 2009
The EPC work (in conjunction with GE and SANTOS CMI) began the first week of December, starting-up in record time the 24th of December 2009.